Service workstreams are specified as reviewable boundaries: what is modeled, what is tested, what is accepted on site and what remains owned by operations after handover. Response objectives stay project-specific because travel, spare access and isolation rules change the achievable recovery path.
Each package names the primary deliverable, the minimum input set and the evidence class it can support. Planning values are not published as certified performance claims.
| Service package | Primary engineering question | Minimum inputs | Evidence class |
|---|---|---|---|
| Throughput validation | Does design rate hold across the sustained peak with stated mix, gaps and buffers? | Order profile, carton/tote mix, peak duration, accumulation length, divert rules | Scenario and sensitivity record |
| Controls responsibility matrix | Who owns command, confirmation, timeout, alarm and restart for each handshake? | WMS/WCS/WES/PLC message list and safety interlocks | Responsibility matrix + FAT script |
| Brownfield cutover planning | How does live fulfillment stay protected during staged conveyor release? | Zone map, fallback paths, commissioning windows, temporary traffic | Cutover and rollback plan |
| Lifecycle serviceability | What spares, access and diagnostics keep mean time to repair within agreed exposure? | Asset list, duty cycle, belt/sprocket criticality, local skill model | Serviceability and spares matrix |
| Divert and merge readiness | Can induction, gap control and reject paths survive irregular product quality? | Product quality limits, photo-eye placement, recirculation capacity | Divert exception playbook |
Capture load units, SKU velocity, order-line distribution, peak window, temperature zones and the longest tolerable interruption for each critical conveyor path. Mark unknowns as assumptions with owners.
Relate belt or roller selection to friction, incline, washdown, elevation and accumulation. Separate greenfield freedom from brownfield column, mezzanine and dock constraints that change transfer geometry.
Document WMS, WCS, WES and PLC responsibilities for release, routing, confirmations, alarms and restart authorization before interface definitions freeze.
Exercise baseline, peak and disturbance cases for divert failures, full zero-pressure accumulation and merge conflicts. Record expected versus observed states, divert accuracy samples and interface cycle-time timeouts for FAT-relevant handshakes.
Repeat applicable checks with installed geometry and real loads. Transfer diagnostics, critical spares guidance and recovery procedures with clear ownership after go-live.
Include the operating calendar, conveyor concept, interface list and the acceptance questions that must be closed before cutover. Assumptions can remain provisional if they are labeled.