Belt lines, divert banks, spirals, transfer conveyors, controls and named interfaces.
Define the conveyor boundary, service clock, access conditions, spare strategy and return-to-service evidence before availability becomes a contractual metric.
Review the Boundary
System availability is calculated only after the measured boundary is named. The record identifies included subsystems, the observation window and whether planned maintenance, lack of upstream work, downstream blockage, utilities or operator delay are excluded.
For a conveying installation, subsystem and end-to-end values may differ. A sorter can be available while the upstream induction rejects cartons; conversely, a WCS can issue valid commands while a mechanical zone remains isolated.
Belt lines, divert banks, spirals, transfer conveyors, controls and named interfaces.
Shift calendar, planned stops and the timestamp source used across equipment logs.
WMS decision, WCS orchestration, PLC execution, facility utility or operating action.
Safe reset, test carton cycle, load disposition and event closure accepted by the site team.
A chute sensor or inventory mismatch prevents release. The plan states who validates physical occupancy, how the WMS/WCS record is reconciled, where the carton waits and which test proves the destination is ready again.
A crushed corner, open flap or excessive overhang is rejected before high-speed divert. Recovery requires a safe removal route and quarantine disposition; bypassing the quality check is not treated as a routine shortcut.
The isolated zone, trapped material and remaining serviceable capacity are identified. Mean time to repair depends on fault diagnosis, safe access, spare availability and the controlled return sequence—not travel time alone.
A critical-spares matrix links each item to installed quantity, failure effect, diagnostic confidence, lead time, shelf-life or storage condition, replacement competence and commissioning step. It distinguishes consumables from parts that can stop a divert bank or remove the system’s redundancy.
| Class | Typical basis | Readiness evidence |
|---|---|---|
| Site stock | High consequence or long replenishment lead time | Labeled location, preservation check and compatible revision |
| Regional stock | Shared component with predictable transport route | Dispatch owner, cutoff time and customs boundary |
| Repairable assembly | Specialist rebuild and controlled exchange | Return authorization, test method and configuration record |
Order profile, test duration, accumulation and buffer assumptions recorded.
See delivery verificationFactory-representable functions, simulated interfaces and open deviations listed.
Map the test scopeInstalled geometry, safety chain, site interfaces and recovery scenarios witnessed.
Define acceptanceCoverage window, escalation owner, access condition and spare path agreed.
Share the asset baseline